
| Shop Number 2300 | - | Built for: W. W.Green |
| {1,739th Lima Built Shay} | ||
| Built: |
Class: 20-2 |
Trucks: |
Cylinders: 2 - 8 x 12 |
| Gear Ratio: |
Wheel Dia.: |
Gauge: |
Boiler:
[Style - Dia.] |
| Boiler Pressure:
160 |
Tractive Effort: |
Factor of Adhesion: |
Maximum Safe Speed: |
| Fuel Type: |
Fuel Capacity: |
Water Capacity: |
Empty Weight: 40,000 |
| Owners: W. W. Green, Berlin, WA, For: Apex Gold Mining Co. #1, Berlin, WA (3-11-1913) purchased by Alaska-Gastineau Mining Co., sent to Hofius Steel & Equip. Co. for repairs. (6-1913 arrived) Alaska-Gastineau Mining Co., Salmon Creek Dam RR #2, Juneau, Territory of Alaska (AK) (6-1916) W. R. Hawthorne Log. Co., Union, WA (11-30-1926) Rose Point Log. Co. #1, Belfair, WA Leonard Johnston Log. Co. #1, Belfair, WA (by 1-1929) Charles Johnston #1, Belfair, WA (12-11-1929) Scott & Easter #1, Belfair, WA |
|||
| Disposition: Scrapped | |||
| Additional Notes:
In 1913, an auxiliary rail brake was added under tender truck by Alaska-Gastineau Mining Co. The Shay was operating on 20# rail. |
|||